EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
allenthoe
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (78)
Research
Workshop
- (2)
-
Horizontal...
-
Cannibalize the...
Empennage
- (17)
-
Finished Empanage
-
Fairings
-
Empanage Attach
-
Rudder Fairings
-
Systems
-
Aft Fueslage wiring
-
AFT Fuselage
-
Elevators
-
Elevators Day 1
-
Finished Horizontal...
-
HS main spar assembly
-
Finished prep and...
-
Finished Rudder and...
-
Vertical Stabilizer...
-
Counter sink Rudder...
-
Preparing for priming
-
Rudder prep
Fuselage
- (31)
-
Section 35 complete
-
Section 35 part 1
-
Section 34
-
Section 33 complete
-
Section 33 part 1
-
Section 32
-
Section 31 Complete
-
Section 31
-
Section 30
-
Section 29 Complete
-
Section 29 part 5
-
Section 29 part 4
-
Section 29 part 3
-
Section 29 part 2
-
Section 29 Part 1
-
Section 28 MISTAKE
-
Section 28 Complete
-
Section 28 part 2
-
Section 28 part 1
-
Section 27 complete
-
Section 27 Part 2
-
Section 27 Part 1
-
Section 26 complete
-
Section 26 part 5...
-
Section 26 part 4
-
Section 26 part 3
-
Section 26 part 2
-
Section 26 part 1
-
Section 25 complete
-
Section 25
-
Fuselage Inventory
Firewall
Tail Feathers
Wings
- (4)
-
Wings 4
-
Wings 3 Bottom Skins
-
Aileron Actuators
-
QB wing part 1
Controls
- (1)
-
Rigging and Wing...
Avionics
Lighting
- (1)
-
Wiring lights
Instrument Panel
- (4)
-
Wings on and wired
-
JD Air Latch
-
More Wiring
-
Panel Installed
Landing Gear
- (1)
-
Brakes finished
Engine
- (4)
-
Engine first run
-
Cowlings
-
Engine part 2
-
Engine part 1
Propeller
- (1)
-
Propeller instal
Fuel System
- (1)
-
Wing Root Fuel Filter
Interior Finish
- (4)
-
Canopy harness
-
Canopy Part 2
-
Canopy part 1
-
Rear window
Paint / Decals
- (2)
-
Vinyl Wrap
-
Priming the rudder
Inspection
Tools
- (5)
-
Rudder coming along
-
Welcome to my workshop
-
Air Compressor
-
Band Saw
-
Bench grinder and...
Builder Name:
Allen Thoe
-
Project:
Vans - RV-14A
-
VIEW REPORTS
Total Hours:
3118
Total Flight Time:
8
Total Expense:
$21996.00
Start/Last Date:
Jul 01, 2020 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=allenthoe
Home or Last Project Picture
May 04, 2022
Rear window
- (15 hours)
Category: Interior Finish
This was a fairly easy process once I went and got myself more clamps and just got past the nerves of cutting into something so expensive. The rear window is about $600 to replace so you really want to take care of it.
I ended up countersinking a little deeper than perfect for the screws that go directly on the window (the ones attached to the roll bar). These have already been oversized after tapping the screw holes so it would be difficult to start this process over. Instead I bought some tinneman washers to sit inside the countersink (just like the skin does on the sides and aft edge) and it looks very clean and actually will be more secure against cracking in the future.
Next I will be building the canopy frame and then it's onto the main canopy piece.
53318FA3-5FBA-4BAF-AF6A-0D3132FA9F24.jpeg
1442E283-FFB5-4AEE-9E77-5632FE7D7CA8.jpeg
BA99D4E9-1217-47B0-A013-E999F023E655.jpeg
45C2ADFD-D955-4A59-A380-70C6D1D31CAE.jpeg
0507B2E2-B33A-4274-824F-DA57BEF9F9F2.jpeg
80D5626E-3AB2-43B8-AFE8-43AC8EA26C1C.jpeg
F04AE49F-C290-45F6-AEFC-18FD66A30464.jpeg
1919E298-774F-4A2B-A9EE-5EE947F02DB1.jpeg
60C3DC00-2DFE-4803-AD5E-100C13678E1C.jpeg
15B09DB2-4BDE-4ADD-BF83-C4C26F796AD1.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.